--- mai7777 <[email protected]> wrote:
> I'm trying to run a regression with around 800 variables, all of
> which (except 4) are control which I don't care to know the results
> on, all I need are the 4 I care about. Is there a way to avoid the
> matsize too small problem by not reporting the control variable
> results?
This sounds like a job for either -xtreg- or -areg-, for more see their
respective helpfiles.
Hope this helps,
Maarten
-----------------------------------------
Maarten L. Buis
Department of Social Research Methodology
Vrije Universiteit Amsterdam
Boelelaan 1081
1081 HV Amsterdam
The Netherlands
visiting address:
Buitenveldertselaan 3 (Metropolitan), room N515
+31 20 5986715
http://home.fsw.vu.nl/m.buis/
-----------------------------------------
*
* For searches and help try:
* http://www.stata.com/help.cgi?search
* http://www.stata.com/support/statalist/faq
* http://www.ats.ucla.edu/stat/stata/