Notice: On April 23, 2014, Statalist moved from an email list to a forum, based at statalist.org.
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
st: Problem Generating ICC Using xtmixed
From
Dylan Galos <[email protected]>
To
[email protected]
Subject
st: Problem Generating ICC Using xtmixed
Date
Fri, 11 Jan 2013 15:47:11 -0600
I'm using xtmixed (using the item as the dependent variable and the
subject as the group variablle) and the postestimation estat icc to
calculate ICCs for a test-retest reliability study of several
Likert-type items. For only one item, the LR test (vs linear regression)
had a chibar2 value of 0, p = 1, and the icc failed to calculate with
error r(498) and the error message "Maximum number of iterations
exceeded" (the xtmixed model itself took 3 iterations to converge). As I
looked through the data, the responses changed between time1 and time2
for many of these subjects (it's probably unreliable), only in this one
item, and I'm not sure what a valid next approach would be to estimate
this, or how to interpret this result/error.
If it helps, my syntax was:
xtmixed var || surveyid:, mle
estat icc
Thank you for your help.
*
* For searches and help try:
* http://www.stata.com/help.cgi?search
* http://www.stata.com/support/faqs/resources/statalist-faq/
* http://www.ats.ucla.edu/stat/stata/