Bookmark and Share

Notice: On April 23, 2014, Statalist moved from an email list to a forum, based at statalist.org.


[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

st: Regarding some simultaneous estimations in stata


From   Sriram Narayanan <[email protected]>
To   [email protected]
Subject   st: Regarding some simultaneous estimations in stata
Date   Thu, 13 May 2010 14:55:29 -0700 (PDT)

I am trying to estimate a simultaneous system in stata where the first stage is a 0-1 variable, the second stage is a count data and the third stage is a continuous variable. I am wondering if there is any way to estimate these simultaneously in STATA. 

Eqn 1: Dependent variable: 0-1 with some IVs (XTLOGIT)
Eqn 2: Dependent variable is count: I am using xtnbreg  
Eqn 3: Dependent variable is a continuous variable (XTREG)

The 0-1 in the first stage has been shown to be endogeneous with the dependent variable in equations 2 and 3. Both equations 2 and 3 in our model are also endogenously determined and share common IV's and the DV from equation 2 is an IV in equation 3. 

Currently I am running individual models, extracting the mills ratio from (1) and adding into (2) and (3). Then I am using the mills ratio from equation 2 separately into equation 3. I am a little uncomfortable with this set up and want to understand the proper procedure to estimate this. Any help would be highly appreciated.

Sriram 


      

*
*   For searches and help try:
*   http://www.stata.com/help.cgi?search
*   http://www.stata.com/support/statalist/faq
*   http://www.ats.ucla.edu/stat/stata/


© Copyright 1996–2018 StataCorp LLC   |   Terms of use   |   Privacy   |   Contact us   |   Site index