<>
If Roy puts some effort into a rewrite, Mata is the way to go to get
around this sort of constraint (as well as produce
faster code).
Kit Baum | Boston College Economics and DIW Berlin | http://ideas.repec.org/e/pba1.html
An Introduction to Stata Programming | http://www.stata-press.com/books/isp.html
An Introduction to Modern Econometrics Using Stata | http://www.stata-press.com/books/imeus.html
On Mar 16, 2009, at 02:33 , Roy wrote:
The current limitation of -sum- option is that it cannot handle a
large number of variables (something to do with the matsize
limitation).
It was easier to write it this way, but I guess I will have to rewrite
it properly to be able to work with a large number of variables. I
might
be able to get to it some time this year.
*
* For searches and help try:
* http://www.stata.com/help.cgi?search
* http://www.stata.com/support/statalist/faq
* http://www.ats.ucla.edu/stat/stata/