| |
[Date Prev][Date Next][Thread Prev][Thread Next][Date index][Thread index]
st: Re: inicial values not feasible
Maybe there is problem with the variable x, y and z.
Take a look of the correlations of these variables:
biprobit (a = b c d) (t = y z) if x!=.
corr x y z if e(sample)
Rodrigo.
----- Original Message -----
From: "Avcharian, Alexis" <[email protected]>
To: "stata" <[email protected]>
Sent: Thursday, March 30, 2006 4:10 PM
Subject: st: inicial values not feasible
I estimated a biprobit model and stata said:
inicial values not feasible
I tried different estimations and realized that the "inicial values not
feasible" problem only occured when i include variable x in the
estimation.
i.e.:
biprobit (a = b c d)(t = x y z) inicial values not feasible
If I don't include x, stata does the regression.
It even works when I include x in the first equation (a= b c d x)(t= y z)
Since x is a very important variable I have to include it in (t= x y z),
so dropping it is not an option.
Can anyone please give me some advice.
Thanks in advance.
Alexis
*
* For searches and help try:
* http://www.stata.com/support/faqs/res/findit.html
* http://www.stata.com/support/statalist/faq
* http://www.ats.ucla.edu/stat/stata/
*
* For searches and help try:
* http://www.stata.com/support/faqs/res/findit.html
* http://www.stata.com/support/statalist/faq
* http://www.ats.ucla.edu/stat/stata/